Study of scheduling DPRD building of North Lombok Regency using BIM 5D with Tekla Structural software
DOI:
https://doi.org/10.51601/ijse.v5i3.174Abstract
The Lombok Utara Regency DPRD Building Construction Project is a multi-story building construction project using conventional scheduling methods with an S-curve. In accordance with Government Regulation No. 16 of 2021 on the implementation regulations of Law No. 28 of 2002 on building construction, which mandates the use of BIM for medium and high-rise buildings. This study aims to investigate the use of BIM through Tekla Structures software in planning project scheduling based on Detailed Engineering Design (DED) data. The research methodology begins with the collection of relevant references and shop drawing data. Using the obtained data, a 3D model can be created using Tekla Structures 2025 software, followed by scheduling tasks using Tekla Task Manager. The advantages of scheduling using Tekla Structures include the ability to create detailed models and facilitate scheduling through its available features, which display visualizations of each stage of progress. Compared to conventional scheduling using an S-curve, Tekla Structures provides accurate information through the visualizations it displays. The scheduling results for the construction project of the Lombok Utara Regency DPRD Building using the S-curve required 139 calendar days, while using Tekla Structures software required 111 calendar days. This study demonstrates that BIM technology can significantly enhance construction project efficiency.
Downloads
References
Sleman K, Rivaldo R, Do’ R, Maulana R, Sely ), Sari N, Et Al. Analisis Penjadwalan Waktu Kerja Proyek Menggunakan Metode Cpm Pada Pembangunan Proyek Gedung Dprd Info Artikel Abstrak. Jurnal Ilmiah Teknik Dan Ilmu Komputer 2024;3:55–62. Https://Doi.Org/10.55123.
Setiawati S, Rezky Ariessa Dewi Dan. Penerapan Metode Cpm Dan Pert Pada Penjadwalan Proyek Konstruksi (Studi Kasus: Rehabilitasi / Perbaikan Dan Peningkatan Infrastruktur Irigasi Daerah Lintas Kabupaten/Kota D.I Pekan Dolok). 2017.
Putra Yd, Hendriyani I, Pratiwi R. Analisis Building Information Modelling (Bim) 5d Pada Pekerjaan Struktur Graha Sucofindo Balikpapan. Jurnal Konstruksi 2024;22:108–15. Https://Doi.Org/10.33364/Konstruksi/V.22-2.2088.
Soebandono B, Hergantoro Gs, Priyo M. Implementasi Building Information Modelling (Bim) Menggunakan Tekla Strukctures Pada Konstruksi Gedung. Bulletin Of Civil Engineering 2022;2:1–6. Https://Doi.Org/10.18196/Bce.V2i1.12492.
Umam F. Pengendalian Biaya Dan Waktu Pada Proyek Pembangunan Hibah Perluasan Gedung Sabhara Polres Lamongan. Dearsip 2022.
Maddeppungeng A, Suryani I, Iskandar M. Analisis Pengendalian Penjadwalan Pembangunan Gedung Administrasi Universitas Pendidikan Indonesia (Upi) Kampus Serang Menggunakan Metode Work Breakdown Structure (Wbs) Dan Kurva-S. Jurnal Fondasi 2015;4.
Basri Rinaldi Mhfs. Analisa Perbandingan Jadwal Pelaksanaan Proyek Antara Critical Path Method (Cpm) Dan Kurva-S. Jurnal Rab Construction Research 2017.
Fuad S, Suroso A. Faktor-Faktor Yang Mempengaruhi Tingkat Penerapan Bim (Building Information Modelling) 4d Di Bumn Konstruksi. Jurnal Konstruksia | 2022;14.
Huda Nugraha G, Whika Elfrida O, Nurdiana A, Susanti R. Jurnal Sipil Dan Arsitektur Perencanaan Ulang Overpass Cabe Raya, Ciputat, Tanggerang Selatan, Berbasis Bim. Jurnal Sipil Dan Arsitektur 2025.
Farizwan J, Hariyadi H, Hamdani H. Studi Efisiensi Volume Material Dan Estimasi Biaya Bangunan Menggunakan Bim 5d Dengan Software Tekla Structures. Spektrum Sipil 2024;11:109–18. Https://Doi.Org/10.29303/Spektrum.V11i2.355.
Setya Wijaya H, Supriyanti D, Claudio J, Dea V, Tunggadewi Ut, Koresponden I*, Et Al. Stabilita || Jurnal Ilmiah Teknik Sipil Aplikasi Building Information Modeling (Bim) Menggunakan Software Tekla Structures 2022 Pada Konstruksi Gedung Klinik Multazam. Jurnal Ilmiah Teknik Sipil 2022.
Kurniawan K. Aplikasi Building Informasi Modeling (Bim) Tekla Structure Pada Konstruksi Atap Dome Gedung Olahraga Utp Surakarta. Jurnal Teknik Sipil 2018;3:273–81.
Simatupang Ph, Sir Tmw, Wadu Va. Integrasi Program Tekla Structures Dan Sap2000 Dalam Perencanaan Gedung Beton Struktural. Jurnal Teknik Sipil 2020;Ix.
Parung H, Tjaronge Mw, Djamaluddin R, Irmawaty R, Amiruddin Aa, Djamaluddin Ar, Et Al. Sosialisasi Aplikasi Teknologi Building Information Modelling (Bim) Pada Sektor Konstruksi Indonesia. Jurnal Tepat (Teknologi Terapan Untuk Pengabdian Masyarakat) N.D.
Yudi A, Ulum Ms, Nugroho Mt. Perancangan Detail Engineering Design Gedung Bertingkat Berbasis Building Information Modeling (Studi Kasus: Asrama Institut Teknologi Sumatera). Media Komunikasi Teknik Sipil 2020;00.
Luth F, Abma V. Perencanaan Penjadwalan Pekerjaan Strukur Groundsill Berbasis Bim 4d Dengan Kolaboratif Model. Proceeding Civil Engineering Research Forum 2024.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Toriqurrahman Toriqurrahman, Hafiz Hamdani, Adryan Fitrayudha

This work is licensed under a Creative Commons Attribution 4.0 International License.